Power factor input
PV engineers would like to model the power factor, as utilities mostly ask for this. The size of the power factor helps to describe how efficiently the power is used. Power factor size and type can be specified on the grid page as shown below:
After the simulation, the values obtained will be reflected at the bottom of the result loss diagram:
Exporting the result table in CSV format
This export would allow users to perform additional steps in identifying the optimal project configurations. How to do it? Just click the "Export table as CSV" button on the results page.