In this release:
-
An additional dimension -'Top height' - to the Object 'Tree' creation was added to make it more realistic:
-
MPPTs conections
When doing cabling user can choose to work on Basic cabling or Advanced cabling. Advanced cabling contains MPPT solution. When defining the inverter, the user needs to add the number of MPPTs per inverter in addition to inputs per MPPT in this inverter. The further step is to select the inverter(s) that would be added to the planning of the cabling. After the inverter is selected, you need to select the strings that will be distributed in this inverter per the defined MPPT logic.